Hi all,
Lots more progress to show with the main junction now almost complete.
Shows where one of the stations will be located (in the gap on the left), SCT sidings and SG loop to the right.
T333 and R707 doing some testing in the SCT siding/loop road.
Main junction showing the intricate point work plus the sugar siding on the left.
The Main junction signal box/diagram, Apex siding crosses over the SG. (Concrete is the SG mainline, has to go through the high speed points).
The drop down to the storage yards underneath.
This last photo shows how the line to the storage yards will be hidden.
Everything shown is now wired up (including point motors) and everything works to plan which is a good sign for everything else electronically. The 3rd photo shows the electrical work on the left including where the bus wire will run through (easy access).