Preparing the shed - Stage 1
The shed is approx 9mx6m, however due to the fact it has to be insulated it will be a tad smaller than that. The previous owners added a section on at the back which gives the impression that it is two rooms. The rear door will be permanently opened. A false roof with manhole has been installed in the main room for added insulation (and for something to hang the lights off!). The benches are yet to be installed as work is still being completed on the insulation and plastering work.
The Layout - Stage 2
Still a lot to be decided with this stage as how much space there is around the room will determine a lot of things. We will be using Digitrax for our DCC system, including a 5amp command station, 8 amp booster and the Zephyr starter pack as another booster/controller. There will be 3 tracks, one standard gauge, two broad (up and down lines) however they can all be accessed from the storage yards below. There will be lots of industries along the line, including a number along the branch line which will run on a level above the main benches. A lot more to add to this section as a lot of the ideas are sitting in Dad's head!
Scenery and Detail - Stage 3
The branch line will be heavily populated with scenery to represent a display type layout. The main line won't be treated with as much scenery however will be detailed nonetheless. Scenery and detailing however are a long, long way off. The layout has to be running at 100% first!
Now before you see the photos I must say, please mind the mess! Most of it will be either thrown out or stored underneath the layout. Hopefully you can get a better idea of where everythings going once the shed starts to develop more.
Till next time!